[Productiehuis] Productiehuis NOC requirements

=PsychiC= (MCH2022) psychic at mch2022.org
Sun Jul 10 20:55:19 CEST 2022


Hello again,

Due to the changing A/V setup with the content we would like alter the 
backstage switch for track Battery.
Abacus and Clairvoyance remain as is.
Please adjust this switch to have 1x 1GbE port with the Dante VLAN that 
is also present on the switches in the PartyArea.
Many thanks :)


On 20/06/2022 23:19, =PsychiC= (MCH2022) wrote:
> Hi,
>
> Tracktents
>  3x switch backstage, 16 ports
>   10 ports VLAN VOC
>   2 ports VLAN HOLOPLOT << Abacus only
>   other ports internet-natted
>
>  3x switch front of house , silent  required , 12 ports
>   8 ports VLAN VOC
>   other ports internet-natted
>
>  Holoplot will provide their own seperated dedicated switching 
> hardware between FoH and the speakersystem.
>  This was discussed with AK on the meetup @ RevSpace we might need 
> something, but we don't need switches.
>  A dedicated UTP cable between FoH with some overlenght and Backstage 
> would be nice.
>
>
> Productiehuis tent
>  1x switch, 16 ports
>  10 ports VLAN VOC
>  other ports internet-natted
>
>
> Serverroom
>  shared switchinfra
>  8x ports VLAN VOC
>  1x port internet public ip v4+v6
>
>
> VLANS
>
> VOC : Layer2 only, needs to be present in tracktents , 
> productiehuistent and serverroom
> Request for magic user on 802.1x to get mobile devices connected via 
> site wifi.
> Layer3 will be provided by c3voc
>
>
> HOLOPLOT : Layer2 only, needs to be present in tracktent abacus only
> Request for magic user on 802.1x to get mobile devices connected via 
> site wifi.
> Layer3 will be provided by Holoplot
>
>
> Public IPs
> 1x public IP needed for the c3voc server
>
> Regards,
>
> PsychiC
>



More information about the Productiehuis mailing list